Client
  • Texcare Industrial Textile Specialists
Year
  • 2019
Rooftop Solar PV
  • Grid-Tied
  • Critical UPS Design
  • Generator Co-generation

Industrial Facility reducing monthly  operational expense and safeguarding against business interruption

For Texcare to legally install Solar PV on the factory roof, we assisted in getting the premises up to code for the property owner. Although this process took significant time and effort, we managed to legally register Texcare for SSEG with COTC. Texcare has the right to export excess energy.

During power outages, the solar PV co-generates, in a carefully controlled fashion with a diesel generator.

The solar PV system outperformed the expectation and we subsequently installed renewable energy at 2 other premises for the same client.

Current impact / stats

300

Engineering Designs Done

2885

Equivalent Trees Planted

440930

kWh Generated

Start your journey to ZERO carbon emissions by 2050

Start your journey